Create a bill of materials
Goal
Create a BOM for a produced item with component lines and optional routing.
Who it is for
manufacturing.manage.
Preconditions
- Produced item and component items exist in the catalog.
- Optional routing already created.
Steps
- Production → Bills of materials → New BOM.
- Select Produced item, Output qty, optional Routing (or No routing).
- Add Components: Component, Qty per, Scrap %; use Add component for more lines (≥1 required).
- Set Default if this should be the item’s default BOM.
- Save. Activate afterward if the BOM is still draft.
Result
A versioned BOM exists. Work orders only accept Active BOMs.
Hard stops
- Create requires at least one line.
- Later in-place edits blocked unless draft — use New version.