Create a routing
Goal
Define a new operation sequence for production.
Who it is for
manufacturing.manage.
Preconditions
- Prefer existing work centers if you cost by cell.
Steps
- Production → Routings → New routing.
- Enter Code, Name (translatable), Status (Active / Inactive in the form).
- Under Operations, add rows: Sequence, work center, Operation, Setup (min), Run (min).
- Use Add operation / remove as needed.
- Save.
Result
Routing can be selected on a BOM as Routing (or BOMs may use No routing).
Hard stops
- 422 on missing code/name or invalid operation payload.