Work order and manufacturing setup
Goal
Configure tenant manufacturing policies and catalogs before running the shop floor.
Who it is for
manufacturing.admin for Manufacturing setup; planners with manage/produce for day-to-day masters.
Preconditions
- Module manufacturing enabled.
- GL system roles: WIP, inventory on hand, factory overhead, production variance.
Steps — Manufacturing setup
- Open Tax & Statutory → Manufacturing setup (nav label Manufacturing setup).
- Options
- Work order release: Require BOM on WO release (default on), Require routing on WO release (default off) — enforced on Release.
- Backflush & scrap: Enable backflush, Backflush on complete, Scrap requires reason, Allow co-products — stored for future shop-floor use; WO service today still uses explicit issue/complete.
- MRP: MRP horizon (days).
- Shop floor: Require operations complete before WO complete (stored), Allow partial material issue (enforced on partial issue payloads).
- Catalog tabs: WO statuses, Scrap reasons, Routing operation types (admin CRUD). Work-order transitions in the engine use fixed statuses planned/released/in_progress/completed/cancelled regardless of catalog labels.
Master-data order
Work centers → Routings → Active BOMs → Work orders. Use Material planning (manufacturing.plan) for make/buy suggestions.
Result
Release and issue behavior matches tenant policy; catalogs are available for labeling.