Create a work order
Goal
Create a Planned work order from an Active BOM.
Who it is for
manufacturing.manage.
Preconditions
- Active BOM with ≥1 component line.
- Warehouse for issues and finished-goods receipt.
- Document numbering for type
work_orderconfigured if you rely on auto numbers.
Steps
- Production → Work orders → New work order.
- Select Bill of materials (active BOMs only, shown as item · version).
- Choose Warehouse, Quantity (> 0), optional Planned start / Planned end.
- Save. BlueMatrix copies item from the BOM, explodes materials (with scrap), and snapshots routing operations when the BOM has a routing.
Result
A Planned work order appears. Next: release and produce. There is no header update API after create — correct mistakes by cancelling (if no WIP cost) and recreating, or continue the lifecycle.
Hard stops
- The bill of materials must be active before it can be used on a work order.
- The bill of materials has no component lines.
- Quantity must be greater than zero.