Bills of materials overview
Goal
Understand versioned BOMs as the component recipe (and optional routing) for a produced item used when creating work orders and exploding demand.
Who it is for
manufacturing.view / manufacturing.manage.
Lifecycle
- Create BOM (Draft or Active depending on how you save) with ≥1 component line.
- In-place line edits only while Draft — otherwise BlueMatrix returns Only draft bills of materials can be edited in place; revise to create a new version.
- Activate sets status Active so the BOM can be used on work orders (The bill of materials must be active before it can be used on a work order.).
- New version (
revise) clones a new Draft version (is_defaultfalse). - Explode shows multi-level component demand (scrap inflated; max depth 20).
- Mark Default to clear other defaults for the same produced item.
Open the screen
Production → Bills of materials.